Please use this identifier to cite or link to this item: https://hdl.handle.net/2440/105784
Citations
Scopus Web of Science® Altmetric
?
?
Full metadata record
DC FieldValueLanguage
dc.contributor.authorNguyen, V.-
dc.contributor.authorCook, S.-
dc.contributor.authorIreland, V.-
dc.date.issued2017-
dc.identifier.citationSystems, 2017; 5(2):29-1-29-21-
dc.identifier.issn2079-8954-
dc.identifier.issn2079-8954-
dc.identifier.urihttp://hdl.handle.net/2440/105784-
dc.descriptionPublished: 29 March 2017-
dc.description.abstractCost-Benefit Analysis (CBA) is often employed to inform decision makers about the desirability of transport infrastructure investment options. One of the main limitations of traditional CBA approaches is that they do not provide a dynamic view that explicitly illustrates the cost and benefit relationships between component entities over time. This paper addresses this issue by describing a System Dynamics (SD) approach that can perform transport infrastructure CBA through the application of systems thinking to develop a causal-loop model that can subsequently be operationalised into an executable stock-and-flow model. Execution of this model readily enables sensitivity analysis of infrastructure investment options and visualisation of the cost-benefit behaviour of each variant over time. The utility of the approach is illustrated through a case study, the Co Chien Bridge project in Vietnam, using a model that incorporates conventional economic metrics and factors that measure indirect project benefits, such as impact on gross domestic product, unemployment rate, and total taxes gained from affected economic sectors.-
dc.description.statementofresponsibilityTiep Nguyen, Stephen Cook and Vernon Ireland-
dc.language.isoen-
dc.publisherMDPI-
dc.rights© 2017 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (http://creativecommons.org/licenses/by/4.0/).-
dc.source.urihttp://www.mdpi.com/2079-8954/5/2/29-
dc.subjectCost-benefit analysis; transport infrastructure project; system dynamics; social and economic factors-
dc.titleApplication of system dynamics to evaluate the social and economic benefits of infrastructure projects-
dc.typeJournal article-
dc.identifier.doi10.3390/systems5020029-
pubs.publication-statusPublished-
dc.identifier.orcidNguyen, V. [0000-0002-5093-0893]-
dc.identifier.orcidCook, S. [0000-0002-7753-8410]-
Appears in Collections:Aurora harvest 7
Entrepreneurship, Commercialisation, and Innovation Centre publications

Files in This Item:
File Description SizeFormat 
hdl_105784.pdfPublished version1.24 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.