Please use this identifier to cite or link to this item: https://hdl.handle.net/2440/108183
Citations
Scopus Web of Science® Altmetric
?
?
Full metadata record
DC FieldValueLanguage
dc.contributor.authorLiu, W.-
dc.contributor.authorChen, G.-
dc.contributor.authorYan, B.-
dc.contributor.authorZhou, Z.-
dc.contributor.authorDu, H.-
dc.contributor.authorZuo, J.-
dc.date.issued2015-
dc.identifier.citationEnergy and Buildings, 2015; 93:143-153-
dc.identifier.issn0378-7788-
dc.identifier.issn1872-6178-
dc.identifier.urihttp://hdl.handle.net/2440/108183-
dc.description.abstractAbstract not available-
dc.description.statementofresponsibilityWei Liu, Guanyi Chen, Beibei Yan, Zhihua Zhou, Haowei Du, Jian Zuo-
dc.language.isoen-
dc.publisherElsevier-
dc.rights© 2015 Published by Elsevier B.V.-
dc.source.urihttp://dx.doi.org/10.1016/j.enbuild.2015.02.030-
dc.subjectCCHP system; thermal energy storage; GSHP; operation strategy-
dc.titleHourly operation strategy of a CCHP system with GSHP and thermal energy storage (TES) under variable loads: a case study-
dc.typeJournal article-
dc.identifier.doi10.1016/j.enbuild.2015.02.030-
pubs.publication-statusPublished-
dc.identifier.orcidZuo, J. [0000-0002-8279-9666]-
Appears in Collections:Aurora harvest 3
Civil and Environmental Engineering publications

Files in This Item:
File Description SizeFormat 
RA_hdl_108183.pdf
  Restricted Access
Restricted Access1.39 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.